Become a BMS expert with IIPD's DBMS course. Learn design, programming, and maintenance of smart building systems. Enroll now for top career opportunities!
Become a BMS Expert: Enroll in IIPD's Comprehensive DBMS Course Today!
Today's buildings are equipped with numerous systems and devices to ensure the comfort and safety of their occupants. A Building Management System (BMS), also known as a Building Automation and Control System (BACS), integrates and oversees all these systems. This includes electrical, HVAC, plumbing, lighting controls, CCTV and security, life safety systems, renewable energy sources, and utility meters for electricity and gas.
Our DBMS course is a comprehensive flagship program that covers all essential aspects of BMS. It is designed for both current BMS engineers and those aspiring to enter the field, providing extensive knowledge and practical skills. Participants will learn about integrating and managing BMS systems, including CCTV and security, power, PLC, VFD, control panels, and the programming and design of BMS controllers.
The entire Diploma course of 174 hours is divided into six inter-connected courses. Â
Program for points transfer using a supervisory controller
Practical session on Field devices
DDC programming
Workstation
Graphics development
Alarms, Trends, Schedules
Troubleshooting
Module 3 - CCTV and Security Systems Expert (CSE)
CCTV
Introduction to CCTV system
Selection of camera
Cabling and termination
Different types of cameras
Night vision systems
DVR configuration
DVR networking
Introduction to IP CAM
NVR configuration
IP cameras and networking
Remote monitoring through phone and internet
Networking
IP Classes Â
Concept of a switch, Router, and Modem
The connection between two computers
LAN and WAN operations
Internetworking basics
Making and Troubleshooting RJ45 Cables
Basics of Media Converters (Eth to Fibre)
Biometrics Access Control
Introduction to Access Control System
The conventional and credential system
Installation and configuration
Types of credential systemsÂ
Biometric access control system
Access control panel and types
Report preparation
Locking system- fail safe and fail secure
RFID, proximity cards
Fire Alarm Panel
Introduction to fire alarm and control system
Conventional fire alarm panels
Addressable fire alarm panels
Types of detectors-Heat, smoke, PIR
Zone and loop concept
Detector addressing
Fire alarm cable types
Fire panel communication system
Fire system design and symbols used
Semi Addressable Fire Alarm Practical
Advanced PLC Program Professional
Introduction
History of PLC
Different Control Methods
Relay, its application, and its features
Electrical wiring diagram of Gates using NO and NC Switches
Implementation of Relay Gates
Introduction to PLC and applications Â
Advantage of PLC over relay wiring Â
PLC Programming Languages Â
General Introduction on SCADA, DCS Â
S7 1200 -SIEMENS PLC Â
Siemens S7 series PLC Anatomy and Models
Software Packages and Versions
TIA Portal First Look
Controller Properties
Configuring Communication
Selection of Controllers
Input , output Addressing, and memory mapping
Uploading and Downloading the program to the controller
Creating new Projects/Programs and Tagname based Programming
Basic Instructions
Online editingÂ
Practice Questions Â
Concepts of Timers - TON, TOF, TP, TONR
Concepts of Counters - CTU, CTD, CTUD
Using Compare, Move and Limit functions
RTC
Remaining instructions
Configuring Analog IO
SCADA -InTouch (Schneider Electric)
Introduction and application of SCADA
Creating new project Â
Basic drawing tools and color changing features Â
Wizards Â
Single switch and light with same tag Â
Linking different tags using scripts Â
On show, while show Â
Automatic decrementing Â
Animation properties – fill, location, orientation, size etc Â
Condition scripts Â
Data change scripts Â
Trends(real time and historical) Â
Key scripts Â
Quick function Â
Practice questions Â
Remaining Features Â
PLC - SCADA Interfacing Â
Binary Output Interfacing Â
Why Inputs cannot be controlled from SCADA. Â
PLC Program and Interfacing Â
Siemens HMIÂ
Select the HMI model Â
Creating a new project Â
Working with TIA portal for PLC tag communication Â
Interfacing and communication settings Â
PROFINET Network configuration Â
Creating New Screens Â
Screen Navigation Â
Addressing and configuring Digital & Analog Tags Â
Configuring Lamps, Switches & IO Field Elements Â
Trends and Graphs Â
User Security configuration Â
Alarm Configuration Â
Using other graphical elements Â
VFD (Danfoss) Â
What is Local, 2-wire, and 3 wire Control why and where it is used  (explanation)
Basic programming parameters and Local Control
2 wire control
Analog Input Control
Program Parameters
Preset frequency using digital input
Relay operation
Display Parameters, Terminal Parameters
3 wire control
Jogging using digital input
All advanced Parameters (Eg:- Skip frequency, Start at power up)
Other digital input parameters
Automatic stopping of the motor when the frequency exceeds a predefined limit
Practice Questions
Electrical Control Panel Wiring Â
How a relay can replace PLC in small applications Â
Switching of single output using relay Â
AND ,OR, NAND NOR gates Â
XOR gate using double pole and then using single pole relay Â
DOL starter Â
Interlocking of two outputs using relay(DOL) Â
Contactors: working and applications Â
DOL starter using contactor Â
Timer 2 modes of operation On delay, Interval Delay Â
Star delta starter wiring of 3 phase motor Â
Alarm System problem using a relay with 3 poles and then reduced to 2 pole Â
PLC Wiring Â
KNX Fundamentals Â
KNX system Argument
KNX System Overview
KNX TP Topology
KNX TP Installation
KNX Bus devices
Basic lighting control programming
Completing the DBMS course at IIPD will empower you with the expertise to design, implement, and manage comprehensive Building Management Systems with confidence. Whether you are an experienced engineer or new to the field, this course will enhance your skills and open up new career opportunities in the rapidly growing BMS industry.
Register now to secure your place in our next DBMS course and take the first step towards mastering the future of smart building technology!
By completing this form, I agree to receive emails/SMS and understand I can opt-out anytime.
Terms & Conditions
1. Payment Terms
100% payment of the amount in maximum 15 days upon the receipt of the invoice.
The payment shall be conducted either in cash, credit/debit card, cheque or bank transfer.
We accept payments online using VISA and MasterCard credit card in AED (or any other
currency)
If you make a payment for our products or services on our website, the details you are asked
to submit will be provided directly to our payment provider via a secured connection
The stated amount is exclusive of VAT, Withholding Tax and other duties, taxes and transfer
related charges which if applicable are payable by the client in addition to the stated
amount.
Minors under the age of 18 are prohibited to register as a User of this website and are not
allowed to transact or use the website.
The cardholder must retain a copy of the transaction records and Merchant policies and
rules.